In Côte-Saint-Luc, HVAC MTL installed 136 heat pumps in an 11-story residential building as part of a major renovation. The work was carried out in several phases, in line with the overall construction schedule and in coordination with other trades. Here are the lessons this project teaches building owners’ associations and property managers.
The project in brief
| Element | Detail |
|---|---|
| Place | Côte-Saint-Luc, Montreal |
| Building | 11-story residential building |
| Context | Major renovation of the building |
| Works | Installation of 136 new heat pumps |
| Organization | Several phases, according to the overall construction plan |
| Coordination | With the other trades present on the construction site |
This information comes from the project sheet: installation of 136 new heat pumps in an 11-story building in Côte-Saint-Luc . We are not publishing other project figures here, such as the exact duration or the size of the team, because they are not included in our public file.
Why work in phases in a large building?
In a major renovation project, heating and air conditioning are just one aspect of the work. The walls, windows, electrical wiring, plumbing, and finishing touches all progress according to their own schedule. Installing 136 units all at once would have been pointless; the overall project plan had to be followed.
Phasing offers several advantages for a building of this size:
- The devices are installed at the right time , when the openings, supports and power supply are ready, and before the finishing touches make access more difficult.
- Other trades are not blocked : everyone works in the freed-up areas, without hindering each other.
- Mistakes are corrected early : a first phase serves as a reference for the following ones, and an installation detail is fixed only once instead of being repeated on all floors.
- The monitoring is clearer for the owner and the manager, who can see the progress phase by phase.
Coordination with other trades
A project like the one in Côte-Saint-Luc relies as much on coordination as on technical expertise. For a heat pump installer, this means coordinating with other stakeholders on the order of work, the routing of pipes and wiring, and access to floors and building facades. This is precisely what unions and building managers are looking for: clear planning, punctual teams, and a single point of contact from start to finish.
What a condominium association or manager should plan for
Every building is different, but a large-scale heat pump project always raises the same questions. Here is the list we recommend addressing before signing:
- The scope : how many units, in which dwellings and which common areas, and who will own them once installed.
- The locations of the outdoor units : facades, balconies or roof, with the supports and access that this implies.
- The electrical capacity of the building and the dwellings, to be validated before choosing the appliances.
- The phased schedule , aligned with that of other works and with the constraints of the occupants.
- A single point of contact at the installer’s office, who liaises with the manager and other departments.
- Post-installation maintenance : a planned maintenance contract prevents 136 devices from aging at their own pace.
- Subsidies : check in advance the eligibility of each dwelling and each appliance.
For the process of a co-owner who wants to install a single heat pump in their unit, read instead installing a heat pump in a condo: procedures with the syndicate .
The same principles apply to a multi-unit building or a small apartment building.
A project with 136 units is unusual, but its principles also apply to a triplex or a small apartment building. Even for five or six heat pumps, it is preferable to:
- conduct a single assessment visit for the entire building, rather than a call per unit;
- choose consistent locations for outdoor units, which respect the facade and allow snow to drain away;
- check the building’s electrical capacity before ordering the appliances;
- group the installations into the same period to limit disruptions;
- standardize the models as much as possible, which simplifies maintenance and spare parts.
For plexes, our article “Multi-zone heat pump: how many heads for a Montreal plex?” helps to choose between several wall units and a multi-zone system.
And what about subsidies in a building?
Hydro-Québec’s LogisVert participation guide outlines several scenarios for buildings (verified October 16, 2026):
- Condominiums, plexes and buildings with 19 units or less are among the eligible dwellings;
- in a building with 20 or more units, an apartment is eligible if it has its own meter and if the work is done by the owner;
- The “Multi-unit dwellings” bonus, which raises the rate to $220 per 1,000 BTU/h at −8 °C, targets multi-unit dwelling owners meeting specific criteria (designated zone, year of construction, electric heating, one meter per dwelling) and excludes condominiums.
The rules vary depending on the building’s configuration: verify eligibility before launching the call for tenders. Our heat pump grants page outlines the current programs.
After installation: think about maintenance from the start
A building equipped with dozens of heat pumps benefits greatly from scheduling maintenance collectively: the same visits, the same checklist for each unit, and a report after each visit. This is the principle behind our contracts for condominiums and apartment buildings . When roof repairs are planned, the disconnection and reconnection of the rooftop units must also be scheduled, a service we offer at $575 per unit (see roof repairs ).
Frequently Asked Questions
How many HVAC MTL heat pumps has it installed in Côte-Saint-Luc?
136 heat pumps were installed in an 11-story residential building as part of a major renovation. The work was carried out in several phases.
Can heat pumps be installed in an occupied building?
Yes, provided that the work is planned on a unit-by-unit basis and the residents are notified. This phasing approach helps to minimize disruption and coordinate the work with other trades.
Can a condominium association obtain the LogisVert subsidy?
Yes, condominiums are among the eligible dwellings according to the LogisVert guide, subject to other conditions. However, the “Multi-unit dwellings” bonus excludes condominiums.
Do you perform maintenance on the heat pumps in a building?
Yes. We offer customized maintenance contracts for unions and managers, with one or two visits per year and a report after each visit.
Are you planning a heat pump project for a building or condominium? Contact us to schedule a visit, or call 438.816.0992.